hubble space telescope

Hubble Space Telescope Orbiting Systems Test (HOST) - STS-95

The Hubble Space Telescope Orbiting Systems Test (HOST) platform is carrying experiments to validate components planned for installation during the third Hubble Space Telescope servicing mission and to evaluate new technologies in an earth orbiting environment. There are four experiments on the HOST platform. The NICMOS Cooling System will allow zero-g verification of a Reverse Turbo Brayton Cycle Cooler which should allow longer life operation than the current dewar system. (2) The HST 486 Computer will allow the identification of any radiation susceptible parts in the DF-224 replacement and demonstrate hardware and software responses to Single Event Upsets (SEU's). (3) Solid State Recorder will compare on-orbit operation of the flight spare solid state recorder with the current HST unit. (4) Fiber Optic Line Test will use the same 4 kbps data stream that is sent to the orbiter's Payload Data Interrogator (PDI) and will be routed to a laptop computer for post-flight comparison.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
4
Average: 4 (1 vote)

HST - Flight Systems & Servicing Projects

The STS-82 mission was the second in a series of planned servicing missions to the orbiting Hubble Space Telescope ("HST"), which had been placed in orbit on 24 April 1990 by Discovery during STS-31. The first servicing mission was done by Space Shuttle Endeavour on STS-61. Work performed by Discovery's crew significantly upgraded the scientific capabilities of the HST and helped to keep the telescope functioning smoothly until the next scheduled servicing missions, which were STS-103 in 1999 and STS-109 in 2002.
 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

HST - Flight Systems & Servicing Projects

The STS-82 mission was the second in a series of planned servicing missions to the orbiting Hubble Space Telescope ("HST"), which had been placed in orbit on 24 April 1990 by Discovery during STS-31. The first servicing mission was done by Space Shuttle Endeavour on STS-61. Work performed by Discovery's crew significantly upgraded the scientific capabilities of the HST and helped to keep the telescope functioning smoothly until the next scheduled servicing missions, which were STS-103 in 1999 and STS-109 in 2002.
 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

STS-125 - HST Servicing Mission 4

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT.  Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
2
Average: 2 (1 vote)

STS-125 - 4" - Cape Kennedy Medals

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT. Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.
Space Shuttle Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules to allow the telescope to continue to function at least through 2014. The crew also installed new thermal blanket insulating panels to provide improved thermal protection, and a soft-capture mechanism that would aid in the safe de-orbiting of the telescope by an unmanned spacecraft at the end of its operational lifespan. The mission also carried an IMAX camera and the crew documented the progress of the mission for an upcoming IMAX movie.

This version has a thinner border around the solar panels of the HST and black for the panels themselves.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-125 - 4" - A-B Emblem

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT. Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.
Space Shuttle Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules to allow the telescope to continue to function at least through 2014. The crew also installed new thermal blanket insulating panels to provide improved thermal protection, and a soft-capture mechanism that would aid in the safe de-orbiting of the telescope by an unmanned spacecraft at the end of its operational lifespan. The mission also carried an IMAX camera and the crew documented the progress of the mission for an upcoming IMAX movie.

This version of the patch was the as-flown version. There was also a prototype version that was visible on crew suits during training for the mission and can be identified by the dotted stitching style around the solar panals of the HST. Thhis version has thicker, solid embroidery around the solar panels. 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-125 - 4" - Prototype Version - Unknown maker

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT. Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.
Space Shuttle Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules to allow the telescope to continue to function at least through 2014. The crew also installed new thermal blanket insulating panels to provide improved thermal protection, and a soft-capture mechanism that would aid in the safe de-orbiting of the telescope by an unmanned spacecraft at the end of its operational lifespan. The mission also carried an IMAX camera and the crew documented the progress of the mission for an upcoming IMAX movie.

This version of the patch was visible on crew suits during training for the mission and can be identified by the dotted stitching style around the solar panals of the HST. The version that was flown has thicker, solid embroidery around the solar panels. 

 KSC-08PD-2871

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-109 - 4" - Unknown maker

STS-109 (SM3B) was a Space Shuttle mission that launched from the Kennedy Space Center on 1 March 2002. It was the 108th mission of the Space Shuttle program, the 27th flight of the orbiter Columbia and the fourth servicing of the Hubble Space Telescope. It was also the last successful mission of the orbiter Columbia before the ill-fated STS-107 mission, which culminated in the Columbia disaster.
The Hubble Space Telescope (HST) was placed in orbit during mission STS-31 on 25 April 1990. Initially designed to operate for 15 years, plans for periodic service and refurbishment were incorporated into its mission from the start.[4] After the successful completion of the second planned service mission (SM2) by the crew of STS-82 in February 1997, three of HST's six gyroscopes failed. NASA decided to split the third planned service mission into two parts, SM3A and SM3B. A fifth and final servicing mission, STS-125 (SM4) launched 11 May 2009. The work performed during SM4 is expected to keep HST in operation through 2014.

This version of the STS-109 patch has slightly different details than the A-B Emblem version. The sun has white thread. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-109 - 4" - A-B Emblem

STS-109 (SM3B) was a Space Shuttle mission that launched from the Kennedy Space Center on 1 March 2002. It was the 108th mission of the Space Shuttle program, the 27th flight of the orbiter Columbia and the fourth servicing of the Hubble Space Telescope. It was also the last successful mission of the orbiter Columbia before the ill-fated STS-107 mission, which culminated in the Columbia disaster.
The Hubble Space Telescope (HST) was placed in orbit during mission STS-31 on 25 April 1990. Initially designed to operate for 15 years, plans for periodic service and refurbishment were incorporated into its mission from the start.[4] After the successful completion of the second planned service mission (SM2) by the crew of STS-82 in February 1997, three of HST's six gyroscopes failed. NASA decided to split the third planned service mission into two parts, SM3A and SM3B. A fifth and final servicing mission, STS-125 (SM4) launched 11 May 2009. The work performed during SM4 is expected to keep HST in operation through 2014.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Hubble 2nd Servicing Mission (Red/Blue)

The STS-82 mission was the second in a series of planned servicing missions to the orbiting Hubble Space Telescope ("HST"), which had been placed in orbit on 24 April 1990 by Discovery during STS-31. The first servicing mission was done by Space Shuttle Endeavour on STS-61. Work performed by Discovery's crew significantly upgraded the scientific capabilities of the HST and helped to keep the telescope functioning smoothly until the next scheduled servicing missions, which were STS-103 in 1999 and STS-109 in 2002.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Hubble 2nd Servicing Mission (Blue)

The STS-82 mission was the second in a series of planned servicing missions to the orbiting Hubble Space Telescope ("HST"), which had been placed in orbit on 24 April 1990 by Discovery during STS-31. The first servicing mission was done by Space Shuttle Endeavour on STS-61. Work performed by Discovery's crew significantly upgraded the scientific capabilities of the HST and helped to keep the telescope functioning smoothly until the next scheduled servicing missions, which were STS-103 in 1999 and STS-109 in 2002.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

STS-82 - 4" - A-B Emblem (Modern)

STS-82 was the 22nd flight of the Space Shuttle Discovery and the 82nd mission of the Space Shuttle program. It was NASA's second mission to service the Hubble Space Telescope, during which Discovery's crew repaired and upgraded the telescope's scientific instruments, increasing its research capabilities. Discovery launched from Kennedy Space Center, Florida, on 11 February 1997, returning to Earth on 21 February 1997 at Kennedy Space Center.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-82 - 4" - A-B Emblem

STS-82 was the 22nd flight of the Space Shuttle Discovery and the 82nd mission of the Space Shuttle program. It was NASA's second mission to service the Hubble Space Telescope, during which Discovery's crew repaired and upgraded the telescope's scientific instruments, increasing its research capabilities. Discovery launched from Kennedy Space Center, Florida, on 11 February 1997, returning to Earth on 21 February 1997 at Kennedy Space Center.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-61 - 4" - A-B Emblem

STS-61 was the first Hubble Space Telescope servicing mission, and the fifth flight of the Space Shuttle Endeavour. The mission launched on 2 December 1993 from Kennedy Space Center in Florida. The mission restored the spaceborne observatory's vision, marred by spherical aberration, with the installation of a new main camera and a corrective optics package. The flight also brought instrument upgrades and new solar arrays to the telescope. With its very heavy workload, the STS-61 mission was one of the most complex in the Shuttle's history. It lasted almost 11 days, and crew members made five spacewalks, an all-time record. Even the retrieval of Intelsat VI on STS-49 in May 1992 required only four. The flight plan allowed for two additional EVAs, which could have raised the total number to seven. The final two contingency EVAs were not made. In order to complete the mission without too much fatigue, the five extravehicular working sessions were shared between two alternating shifts of two astronauts.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-31 - Unknown maker

STS-31 was the thirty-fifth mission of the American Space Shuttle program, which launched the Hubble Space Telescope astronomical observatory into Earth orbit. The mission used the Space Shuttle Discovery, which lifted off from Launch Pad 39B on 24 April 1990 from Kennedy Space Center, Florida.
Discovery's crew deployed the telescope on 25 April, and spent the rest of the mission tending to various scientific experiments in the shuttle's payload bay and operating a set of IMAX cameras to record the mission.

Could be an A-B Emblem version, the source usually has A-B Emblem patches. Stitching is tighter.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-31 A-B Emblem

STS-31 was the thirty-fifth mission of the American Space Shuttle program, which launched the Hubble Space Telescope astronomical observatory into Earth orbit. The mission used the Space Shuttle Discovery, which lifted off from Launch Pad 39B on 24 April 1990 from Kennedy Space Center, Florida.
Discovery's crew deployed the telescope on 25 April, and spent the rest of the mission tending to various scientific experiments in the shuttle's payload bay and operating a set of IMAX cameras to record the mission.

This patch is one of the first shuttle patches by A-B that is not fully embroidered.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Hubble Servicing Mission - Replacement Solar Arrays

STS-61

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

Hubble High Resolution Spectrograph (HRS) - STS-31

The GHRS (formerly High Resolution Spectrograph, HRS) is the dedicated instrument aboard the Hubble Space Telescope for performing high resolution spectroscopy at Ultra-Violet wavelengths.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

Hubble 2nd Servicing Mission (Purple)

The STS-82 mission was the second in a series of planned servicing missions to the orbiting Hubble Space Telescope ("HST"), which had been placed in orbit on 24 April 1990 by Discovery during STS-31. The first servicing mission was done by Space Shuttle Endeavour on STS-61. Work performed by Discovery's crew significantly upgraded the scientific capabilities of the HST and helped to keep the telescope functioning smoothly until the next scheduled servicing missions, which were STS-103 in 1999 and STS-109 in 2002.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Hubble 2nd Servicing Mission - Fine Guidance Sensor

STS-82

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
4
Average: 4 (1 vote)

Hubble Flight Systems and Servicing Project

The Hubble Space Telescope Flight Systems & Servicing Project is responsible for the integration, testing, calibration and maintenance of existing HST orbital replaceable components; the development of all flight support hardware required to carry out a servicing mission; the management and planning of the HST on orbit servicing program; and the design, development, and fabrication of second generation HST scientific instruments, flight hardware, and ground support equipment required to maintain the HST in the state necessary to satisfy all science objectives through it's 15-year mission.

Project: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

Hubble Space Telescope - Maintenance & Refurbishment - Lockheed

Hubble Space Telescope - Maintenance & Refurbishment - Lockheed

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Hubble Space Telescope - 10 years

commemorative

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - hubble space telescope