johnson

added via import

STS-134 - 4" - "Wives"

This patch commemorates the wives of the STS-134 crew. Sold by the U.S. Spacewalk of Fame Foundation.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-134 - 4" - A-B Emblem

STS-134 (ISS assembly flight ULF6) was the penultimate mission of NASA's Space Shuttle program. The mission marked the 25th and last spaceflight of Space Shuttle Endeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final space shuttle mission if STS-135 did not receive funding from Congress; however, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. The Launch On Need mission, a contingency mission to rescue a stranded STS-134 crew, would have been the STS-135 flight (formerly STS-335), flown by Atlantis.
Changes in the design of the main payload, AMS-02, as well as delays to STS-133, led to delays in the mission. The first launch attempt on 29 April 2011 was scrubbed at 12:20 pm by launch managers due to problems with two heaters on one of the orbiter's auxiliary power units (APU). Endeavour launched successfully at 08:56:28 EDT (12:56:28 UTC)[14] on 16 May 2011, and landed for the final time on 1 June 2011.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-400 - "Hubble Rescue Team"

STS-400 was the Space Shuttle contingency support (Launch On Need) flight which would have been launched using Space Shuttle Endeavour if a major problem occurred on Space Shuttle Atlantis during STS-125, the final Hubble Space Telescope servicing mission (HST SM-4).
Due to the much lower orbital inclination of the HST compared to the ISS, the shuttle crew would have been unable to use the International Space Station as a "safe haven" and NASA would not have been able to follow the usual plan of recovering the crew with another shuttle at a later date. Instead, NASA developed a plan to conduct a shuttle-to-shuttle rescue mission, similar to proposed rescue missions for pre-ISS flights. The rescue mission would have been launched only three days after call up and as early as seven days after the launch of STS-125 since the crew of Atlantis would only have about three weeks of consumables after launch.

This patch is an unofficial reproduction based on original artwork. 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-125 - 4" - Cape Kennedy Medals

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT. Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.
Space Shuttle Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules to allow the telescope to continue to function at least through 2014. The crew also installed new thermal blanket insulating panels to provide improved thermal protection, and a soft-capture mechanism that would aid in the safe de-orbiting of the telescope by an unmanned spacecraft at the end of its operational lifespan. The mission also carried an IMAX camera and the crew documented the progress of the mission for an upcoming IMAX movie.

This version has a thinner border around the solar panels of the HST and black for the panels themselves.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-125 - 4" - A-B Emblem

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT. Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.
Space Shuttle Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules to allow the telescope to continue to function at least through 2014. The crew also installed new thermal blanket insulating panels to provide improved thermal protection, and a soft-capture mechanism that would aid in the safe de-orbiting of the telescope by an unmanned spacecraft at the end of its operational lifespan. The mission also carried an IMAX camera and the crew documented the progress of the mission for an upcoming IMAX movie.

This version of the patch was the as-flown version. There was also a prototype version that was visible on crew suits during training for the mission and can be identified by the dotted stitching style around the solar panals of the HST. Thhis version has thicker, solid embroidery around the solar panels. 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-125 - 4" - Prototype Version - Unknown maker

STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final space shuttle servicing mission to the Hubble Space Telescope (HST). Launch occurred on 11 May 2009 at 2:01 pm EDT. Landing occurred on 24 May at 11:39 am EDT, with the mission lasting a total of just under 13 days.
Space Shuttle Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules to allow the telescope to continue to function at least through 2014. The crew also installed new thermal blanket insulating panels to provide improved thermal protection, and a soft-capture mechanism that would aid in the safe de-orbiting of the telescope by an unmanned spacecraft at the end of its operational lifespan. The mission also carried an IMAX camera and the crew documented the progress of the mission for an upcoming IMAX movie.

This version of the patch was visible on crew suits during training for the mission and can be identified by the dotted stitching style around the solar panals of the HST. The version that was flown has thicker, solid embroidery around the solar panels. 

 KSC-08PD-2871

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-123 - 4" - A-B Emblem

STS-123 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Endeavour. STS-123 was the 1J/A ISS assembly mission. The original launch target date was 14 February 2008 but after the delay of STS-122, the shuttle was launched on 11 March 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (Kibō), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 16 days and 14 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.

The crew patch depicts the space shuttle in orbit with the crew names trailing behind. STS-123's major additions to ISS (the ELM-PS installation with the shuttle robotic arm and the fully constructed SPDM) are both illustrated. The ISS is shown in the configuration that the STS-123 crew will encounter when they arrive.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Team Nasa JSC

Tags: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - johnson