bloomfield

added via import

STS-110 - 4" - Unknown maker

STS-110 was a Space Shuttle mission to the International Space Station (ISS) on 8–19 April 2002 flown by Space Shuttle Atlantis. The main purpose was to install the S0 Truss segment, which forms the backbone of the truss structure on the station.
The main purpose of STS-110 was to attach the S0 Truss segment to the International Space Station (ISS) to the Destiny Laboratory Module. It forms the backbone of the station to which the S1 and P1 truss segments were attached (on the following missions STS-112 and STS-113, respectively).
STS-110 also delivered the Mobile Transporter (MT), which is an 885 kilograms (1,950 lb) (1,950 lb) assembly that glides down rails on the station integrated trusses. During the next shuttle mission, STS-111, the Mobile Base System (MBS) was mounted to the MT. This Mobile Servicing System (MSS) allows the Canadarm2 to travel down the length of the installed truss structure.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-110 - 4" - A-B Emblem

STS-110 was a Space Shuttle mission to the International Space Station (ISS) on 8–19 April 2002 flown by Space Shuttle Atlantis. The main purpose was to install the S0 Truss segment, which forms the backbone of the truss structure on the station.
The main purpose of STS-110 was to attach the S0 Truss segment to the International Space Station (ISS) to the Destiny Laboratory Module. It forms the backbone of the station to which the S1 and P1 truss segments were attached (on the following missions STS-112 and STS-113, respectively).
STS-110 also delivered the Mobile Transporter (MT), which is an 885 kilograms (1,950 lb) (1,950 lb) assembly that glides down rails on the station integrated trusses. During the next shuttle mission, STS-111, the Mobile Base System (MBS) was mounted to the MT. This Mobile Servicing System (MSS) allows the Canadarm2 to travel down the length of the installed truss structure.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-97 - 4" - A-B Emblem

STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Module, and delivered supplies for the station's crew.

During the 11-day mission, the primary objective was completed, which was to deliver and connect the first set of U.S.-provided solar arrays to the International Space Station. The astronauts completed three spacewalks, during which they prepared a docking port for arrival of the Destiny Laboratory Module, installed Floating Potential Probes to measure electrical potential surrounding the station, installed a camera cable outside the Unity Module, and transferred supplies, equipment and refuse between Endeavour and the station.

The crew patch depicts the Space Shuttle docked to ISS in low Earth orbit after the activation of the P6 electrical power system. Gold and silver are used to highlight the portion of ISS that will be installed by the STS-97 crew. The Sun, central to the design, is the source of energy for ISS.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-86 - 4" - Unknown Maker (No Wolf)

STS-86 was a Space Shuttle Atlantis mission to the Mir space station. This was the last Atlantis mission before it was taken out of service temporarily for maintenance and upgrades, including the glass cockpit.

The seventh Mir Docking mission carried a SPACEHAB double module for the docking with Mir, cargo transfer and an astronaut exchange.
Highlights of the 10 day mission include five days of docked operations between Atlantis and Mir and the exchange of crew members Foale and Wolf to continue a permanent American presence of the Russia complex. A spacewalk is scheduled to retrieve the four Mir Environmental Effects Payloads which were attached to the Mir's docking module by Linda Godwin and Rich Clifford during STS-76 to characterize the environment surrounding the Mir space station. Atlantis will carry the SPACEHAB double module to support the transfer of logistics and supplies for Mir and the return of experiment hardware and specimens to Earth.
There is thick white stitching outlining the "stars" stripe below the globe. No Wolf tab. 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-86 - 4" - Unknown Maker (Russian source)

STS-86 was a Space Shuttle Atlantis mission to the Mir space station. This was the last Atlantis mission before it was taken out of service temporarily for maintenance and upgrades, including the glass cockpit.

The seventh Mir Docking mission carried a SPACEHAB double module for the docking with Mir, cargo transfer and an astronaut exchange.
Highlights of the 10 day mission include five days of docked operations between Atlantis and Mir and the exchange of crew members Foale and Wolf to continue a permanent American presence of the Russia complex. A spacewalk is scheduled to retrieve the four Mir Environmental Effects Payloads which were attached to the Mir's docking module by Linda Godwin and Rich Clifford during STS-76 to characterize the environment surrounding the Mir space station. Atlantis will carry the SPACEHAB double module to support the transfer of logistics and supplies for Mir and the return of experiment hardware and specimens to Earth.
There is white thread outlining the "stars" stripe below the globe. Cut edge, integrated, not sewn-on tab.
Sold from Russia.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-86 - 4" - Unknown Maker (No Wolf)

STS-86 was a Space Shuttle Atlantis mission to the Mir space station. This was the last Atlantis mission before it was taken out of service temporarily for maintenance and upgrades, including the glass cockpit.

The seventh Mir Docking mission carried a SPACEHAB double module for the docking with Mir, cargo transfer and an astronaut exchange.
Highlights of the 10 day mission include five days of docked operations between Atlantis and Mir and the exchange of crew members Foale and Wolf to continue a permanent American presence of the Russia complex. A spacewalk is scheduled to retrieve the four Mir Environmental Effects Payloads which were attached to the Mir's docking module by Linda Godwin and Rich Clifford during STS-76 to characterize the environment surrounding the Mir space station. Atlantis will carry the SPACEHAB double module to support the transfer of logistics and supplies for Mir and the return of experiment hardware and specimens to Earth.
There is white dashed thread outlining the "stars" stripe below the globe.
This version is lacking the "Wolf" tab (added to the crew manifest later). 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-86 - 4" - Eagle Crest Emblem (No Wolf)

STS-86 was a Space Shuttle Atlantis mission to the Mir space station. This was the last Atlantis mission before it was taken out of service temporarily for maintenance and upgrades, including the glass cockpit.

The seventh Mir Docking mission carried a SPACEHAB double module for the docking with Mir, cargo transfer and an astronaut exchange.
Highlights of the 10 day mission include five days of docked operations between Atlantis and Mir and the exchange of crew members Foale and Wolf to continue a permanent American presence of the Russia complex. A spacewalk is scheduled to retrieve the four Mir Environmental Effects Payloads which were attached to the Mir's docking module by Linda Godwin and Rich Clifford during STS-76 to characterize the environment surrounding the Mir space station. Atlantis will carry the SPACEHAB double module to support the transfer of logistics and supplies for Mir and the return of experiment hardware and specimens to Earth.
There is no white striping on the "stars" stripe below the globe.
This version is lacking the "Wolf" tab (added to the crew manifest later). 

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-86 - 4" - A-B Emblem

STS-86 was a Space Shuttle Atlantis mission to the Mir space station. This was the last Atlantis mission before it was taken out of service temporarily for maintenance and upgrades, including the glass cockpit.

The seventh Mir Docking mission carried a SPACEHAB double module for the docking with Mir, cargo transfer and an astronaut exchange.
Highlights of the 10 day mission include five days of docked operations between Atlantis and Mir and the exchange of crew members Foale and Wolf to continue a permanent American presence of the Russia complex. A spacewalk is scheduled to retrieve the four Mir Environmental Effects Payloads which were attached to the Mir's docking module by Linda Godwin and Rich Clifford during STS-76 to characterize the environment surrounding the Mir space station. Atlantis will carry the SPACEHAB double module to support the transfer of logistics and supplies for Mir and the return of experiment hardware and specimens to Earth.
An early release of the STS-86 patch without the "Wolf" tab was also made by A-B Emblem.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-86 - 4 - A-B Emblem No Wolf

This patch is lacking its Payload Specialist tab featuring Wolf. 
Wendy B. Lawrence was scheduled to replace C. Michael Foale onboard Mir. However, due to concerns about the minimum size restrictions of the Russian MIR Orlan EVA Spacesuit, she was replaced by her backup, David Wolf. Wolf was originally scheduled to fly on the STS-89 mission to Mir and join the Mir 24 crew.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - bloomfield