Department of Defense

Synonym: 
dod

STS-53 - 4" - Unknown maker

STS-53 was a Space Shuttle Discovery mission in support of the United States Department of Defense. The mission was launched on 2 December 1992 from Kennedy Space Center, Florida.

Discovery carried a classified primary payload for the United States Department of Defense, two unclassified secondary payloads and nine unclassified middeck experiments.
Discovery's primary payload, USA-89 NSSDC ID 1992-086B is also known as "DoD-1", and was the shuttle's last major payload for the Department of Defense. The satellite was the third launch of a Satellite Data System-2 military communications satellite, after USA-40 on STS-28 and STS-38's deployment of USA-67.
Secondary payloads contained in or attached to Get Away Special (GAS) hardware in the cargo bay included the Orbital Debris Radar Calibration Spheres (ODERACS) and the combined Shuttle Glow Experiment/Cryogenic Heat Pipe Experiment (GCP).

Based on other patches sold adjacently to this, the source is likely the same as those as sold by "Bama Space Patches". 

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

DoD Support - Apollo

Unknown maker, but embroidery suggests a modern origin or a modern reproduction.

Project: 
Classification: 
Tags: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-53 - 4" - Eagle Crest Emblem Inc.

STS-53 was a Space Shuttle Discovery mission in support of the United States Department of Defense. The mission was launched on 2 December 1992 from Kennedy Space Center, Florida.

Discovery carried a classified primary payload for the United States Department of Defense, two unclassified secondary payloads and nine unclassified middeck experiments.
Discovery's primary payload, USA-89 NSSDC ID 1992-086B is also known as "DoD-1", and was the shuttle's last major payload for the Department of Defense. The satellite was the third launch of a Satellite Data System-2 military communications satellite, after USA-40 on STS-28 and STS-38's deployment of USA-67.
Secondary payloads contained in or attached to Get Away Special (GAS) hardware in the cargo bay included the Orbital Debris Radar Calibration Spheres (ODERACS) and the combined Shuttle Glow Experiment/Cryogenic Heat Pipe Experiment (GCP).

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-53 - 4" - A-B Emblem

STS-53 was a Space Shuttle Discovery mission in support of the United States Department of Defense. The mission was launched on 2 December 1992 from Kennedy Space Center, Florida.

Discovery carried a classified primary payload for the United States Department of Defense, two unclassified secondary payloads and nine unclassified middeck experiments.
Discovery's primary payload, USA-89 NSSDC ID 1992-086B is also known as "DoD-1", and was the shuttle's last major payload for the Department of Defense. The satellite was the third launch of a Satellite Data System-2 military communications satellite, after USA-40 on STS-28 and STS-38's deployment of USA-67.
Secondary payloads contained in or attached to Get Away Special (GAS) hardware in the cargo bay included the Orbital Debris Radar Calibration Spheres (ODERACS) and the combined Shuttle Glow Experiment/Cryogenic Heat Pipe Experiment (GCP).

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-44 - 4" - Unknown maker

STS-44 was a Space Shuttle mission on Atlantis that launched 24 November 1991. It was a U.S. Department of Defense space mission.

The mission was dedicated to the Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite and attached Inertial Upper Stage (IUS), deployed on flight day one. Cargo bay and middeck payloads included the Interim Operational Contamination Monitor (IOCM), Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment III (RME III), Visual Function Tester-1 (VFT-1), Ultraviolet Plume Instrument (UVPI), Bioreactor Flow, Particle Trajectory experiment, and Extended Duration Orbiter Medical Project, a series of investigations in support of Extended Duration Orbiter.

The landing was on 1 December 1991 at 2:34:44 pm PST, Runway 5, Edwards Air Force Base, California.

This version of the STS-44 patch has a cut edge, bare cloth back and white flames from the SRB's. The external tank is also lighter so the red band stands out more.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-44 - 4" - Unknown maker

STS-44 was a Space Shuttle mission on Atlantis that launched 24 November 1991. It was a U.S. Department of Defense space mission.

The mission was dedicated to the Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite and attached Inertial Upper Stage (IUS), deployed on flight day one. Cargo bay and middeck payloads included the Interim Operational Contamination Monitor (IOCM), Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment III (RME III), Visual Function Tester-1 (VFT-1), Ultraviolet Plume Instrument (UVPI), Bioreactor Flow, Particle Trajectory experiment, and Extended Duration Orbiter Medical Project, a series of investigations in support of Extended Duration Orbiter.

The landing was on 1 December 1991 at 2:34:44 pm PST, Runway 5, Edwards Air Force Base, California.

This version of the STS-44 patch can be readily identified by the heavily embroidered stars.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-44 - 4" - Eagle Crest Emblem Inc.

STS-44 was a Space Shuttle mission on Atlantis that launched 24 November 1991. It was a U.S. Department of Defense space mission.

The mission was dedicated to the Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite and attached Inertial Upper Stage (IUS), deployed on flight day one. Cargo bay and middeck payloads included the Interim Operational Contamination Monitor (IOCM), Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment III (RME III), Visual Function Tester-1 (VFT-1), Ultraviolet Plume Instrument (UVPI), Bioreactor Flow, Particle Trajectory experiment, and Extended Duration Orbiter Medical Project, a series of investigations in support of Extended Duration Orbiter.

The landing was on 1 December 1991 at 2:34:44 pm PST, Runway 5, Edwards Air Force Base, California.

The Eagle Crest Emblem Inc. version of the STS-44 patch can be identified by the 9 yellow orange cresents in the rocket plume. (The AB Emblem patch has 8).

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-44 - 4" - A-B Emblem

STS-44 was a Space Shuttle mission on Atlantis that launched 24 November 1991. It was a U.S. Department of Defense space mission.

The mission was dedicated to the Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite and attached Inertial Upper Stage (IUS), deployed on flight day one. Cargo bay and middeck payloads included the Interim Operational Contamination Monitor (IOCM), Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment III (RME III), Visual Function Tester-1 (VFT-1), Ultraviolet Plume Instrument (UVPI), Bioreactor Flow, Particle Trajectory experiment, and Extended Duration Orbiter Medical Project, a series of investigations in support of Extended Duration Orbiter.

The landing was on 1 December 1991 at 2:34:44 pm PST, Runway 5, Edwards Air Force Base, California.

The A-B Emblem version of the STS-44 patch can be identified by the 5 orange dots in the rocket plume.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Blue Gemini Project

Blue Gemini was a United States Air Force (USAF) project first proposed in August 1962 for a series of seven flights of Gemini spacecraft to enable the Air Force to gain manned spaceflight experience prior to the launch of the Manned Orbital Development System, or MODS. The plan was to utilize off-the-shelf Gemini spacecraft.

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Space Test Payload-1 (STP-1)

STS-39 carried the Space Test Payload-1 (STP-1)

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-39 - 4" - A-B Emblem

 

STS-39 was the twelfth mission of the Space Shuttle Discovery. The primary purpose of the mission was to conduct a variety of payload experiments for the Department of Defense.

STS-39 was a dedicated Department of Defense mission. Unclassified payload included Air Force Program-675 (AFP675); Infrared Background Signature Survey (IBSS) with Critical Ionization Velocity (CIV), Chemical Release Observation (CRO) and Shuttle Pallet Satellite-II (SPAS-II) experiments; and Space Test Payload-1 (STP-1). Classified payload consisted of Multi-Purpose Release Canister (MPEC). Also on board was Radiation Monitoring Equipment III (RME III) and Cloud Logic to Optimize Use of Defense Systems-1A (CLOUDS-1A).

STS-39 was the first unclassified Department of Defense (DoD)-dedicated Space Shuttle mission. There had previously been seven Shuttle missions dedicated to the DoD, but those were considered classified and information about the operation or success of the payloads or experiments was not released. For STS-39, only the payload in the Multi-Purpose Experiment Canister (MPEC) was listed as classified.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-33 - 3" - Swissartex

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). STS-33 was the 32nd shuttle mission overall, the ninth flight of Discovery, and the fifth shuttle mission in support of the DoD. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Pad A, Launch Complex 39 at Kennedy Space Center (KSC), Florida, on 22 November 1989 at 7:23 pm EST; it landed at Edwards Air Force Base, California, on 28 November.

Mostly green on the Earth.

Size: 
3" / 76mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-33 - Eagle Crest Emblem

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). STS-33 was the 32nd shuttle mission overall, the ninth flight of Discovery, and the fifth shuttle mission in support of the DoD. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Pad A, Launch Complex 39 at Kennedy Space Center (KSC), Florida, on 22 November 1989 at 7:23 pm EST; it landed at Edwards Air Force Base, California, on 28 November.

 

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-33 - 3" - Unknown maker

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). STS-33 was the 32nd shuttle mission overall, the ninth flight of Discovery, and the fifth shuttle mission in support of the DoD. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Pad A, Launch Complex 39 at Kennedy Space Center (KSC), Florida, on 22 November 1989 at 7:23 pm EST; it landed at Edwards Air Force Base, California, on 28 November.

3" version where the wingtips do not extend beyond the border. 

Size: 
3" / 76mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-33 - Unknown maker

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). STS-33 was the 32nd shuttle mission overall, the ninth flight of Discovery, and the fifth shuttle mission in support of the DoD. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Pad A, Launch Complex 39 at Kennedy Space Center (KSC), Florida, on 22 November 1989 at 7:23 pm EST; it landed at Edwards Air Force Base, California, on 28 November.

The blue border area in this patch is linear rather than radiating, and there is green stitching in the Earth.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-33 - A-B Emblem - no star

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). STS-33 was the 32nd shuttle mission overall, the ninth flight of Discovery, and the fifth shuttle mission in support of the DoD. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Pad A, Launch Complex 39 at Kennedy Space Center (KSC), Florida, on 22 November 1989 at 7:23 pm EST; it landed at Edwards Air Force Base, California, on 28 November.

S. David Griggs, a veteran of STS 51-D, was to have been the pilot of this mission. He was killed in the crash of a vintage WWII aircraft in June 1989 while training to serve as pilot on STS-33, and is commemorated on the mission insignia with a single gold star on the blue field.

This version is nearly identical to the regular A-B Emblem version, however it is missing the star. I have seen more than one of these so it does not seem likely that this is a fluke.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-33 - A-B Emblem

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). STS-33 was the 32nd shuttle mission overall, the ninth flight of Discovery, and the fifth shuttle mission in support of the DoD. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Pad A, Launch Complex 39 at Kennedy Space Center (KSC), Florida, on 22 November 1989 at 7:23 pm EST; it landed at Edwards Air Force Base, California, on 28 November.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-28 - Swissartex

STS-28 was the 30th NASA Space Shuttle mission, the fourth shuttle mission dedicated to United States Department of Defense purposes, and the eighth flight of Space Shuttle Columbia. The mission launched on 8 August 1989 and traveled 2.1 million miles during 81 orbits of the Earth, before landing on runway 17 of Edwards Air Force Base, California, on 13 August. STS-28 was also Columbia's first flight since January 1986, when it had flown STS-61-C, the mission directly preceding the Challenger disaster of STS-51-L. The mission details of STS-28 are classified, but the payload is widely believed to have been the first SDS-2 communications satellite. The altitude of the mission is classified, but must have been between 220 kilometers (140 mi) and 380 kilometers (240 mi), based on the distance traveled and the number of orbits.

Dark background, thick lettering.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-28 - Unknown maker

STS-28 was the 30th NASA Space Shuttle mission, the fourth shuttle mission dedicated to United States Department of Defense purposes, and the eighth flight of Space Shuttle Columbia. The mission launched on 8 August 1989 and traveled 2.1 million miles during 81 orbits of the Earth, before landing on runway 17 of Edwards Air Force Base, California, on 13 August. STS-28 was also Columbia's first flight since January 1986, when it had flown STS-61-C, the mission directly preceding the Challenger disaster of STS-51-L. The mission details of STS-28 are classified, but the payload is widely believed to have been the first SDS-2 communications satellite. The altitude of the mission is classified, but must have been between 220 kilometers (140 mi) and 380 kilometers (240 mi), based on the distance traveled and the number of orbits.

Modern embroidery in this patch.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-28 - A-B Emblem

STS-28 was the 30th NASA Space Shuttle mission, the fourth shuttle mission dedicated to United States Department of Defense purposes, and the eighth flight of Space Shuttle Columbia. The mission launched on 8 August 1989 and traveled 2.1 million miles during 81 orbits of the Earth, before landing on runway 17 of Edwards Air Force Base, California, on 13 August. STS-28 was also Columbia's first flight since January 1986, when it had flown STS-61-C, the mission directly preceding the Challenger disaster of STS-51-L. The mission details of STS-28 are classified, but the payload is widely believed to have been the first SDS-2 communications satellite. The altitude of the mission is classified, but must have been between 220 kilometers (140 mi) and 380 kilometers (240 mi), based on the distance traveled and the number of orbits.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-27 - Swissartex

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on 2 December 1988 on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense.

This version of the STS-27 patch was manufactured by Eagle Crest Emblem Inc. of Taiwan. (Formaly Swissartex Emblem Inc. of Asheville, NC.28814).

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-27 - 3" - Unknown maker

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on 2 December 1988 on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense.

The embroidery of the names is quite crude.

Size: 
3" / 76mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-27 - A-B Emblem (modern)

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on 2 December 1988 on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense.

This is a modern version from A-B Emblem. The crew name embroidery is tighter than the original.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-27 - A-B Emblem

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on 2 December 1988 on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

DSP Flight 20

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Defense Support Program DSP-18

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Defense Support Program DSP-17

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Atlas Launch Vehicles

Project: 
Classification: 
Tags: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

NRO Cape

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

OSL - Office of Space Launch (National Reconnaissance Office)

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Advanced Research and Global Observation Satellite (ARGOS)

ARGOS is a testbed and demonstration program for advanced remote sensing technologies for the US Air Force?s Space Test Program (STP). ARGOS's primary objective is to fly and operate advanced payloads that include two technology demonstrations and seven experiment payloads for global and celestial observation. http://www.pxi.com/Programs_Projects/ARGOS.html

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

NAVSTAR V

February 1980

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - Department of Defense