coats

STS-41D - 4" - Lion Brothers

STS-41-D was the 12th flight of NASA's Space Shuttle program, and the first mission of the orbiter Discovery. It was launched from Kennedy Space Center, Florida, on 30 August 1984, and landed on 5 September. Three commercial communications satellites were deployed into orbit during the six-day mission, and a number of scientific experiments were conducted.
The mission was delayed by more than two months from its original planned launch date, having experienced the Space Shuttle program's first launch abort at T-6 seconds on 26 June 1984.

The Lion Brothers version of the STS-41D patch has the largest sailing ship.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-39 - 4" - A-B Emblem

 

STS-39 was the twelfth mission of the Space Shuttle Discovery. The primary purpose of the mission was to conduct a variety of payload experiments for the Department of Defense.

STS-39 was a dedicated Department of Defense mission. Unclassified payload included Air Force Program-675 (AFP675); Infrared Background Signature Survey (IBSS) with Critical Ionization Velocity (CIV), Chemical Release Observation (CRO) and Shuttle Pallet Satellite-II (SPAS-II) experiments; and Space Test Payload-1 (STP-1). Classified payload consisted of Multi-Purpose Release Canister (MPEC). Also on board was Radiation Monitoring Equipment III (RME III) and Cloud Logic to Optimize Use of Defense Systems-1A (CLOUDS-1A).

STS-39 was the first unclassified Department of Defense (DoD)-dedicated Space Shuttle mission. There had previously been seven Shuttle missions dedicated to the DoD, but those were considered classified and information about the operation or success of the payloads or experiments was not released. For STS-39, only the payload in the Multi-Purpose Experiment Canister (MPEC) was listed as classified.

Size: 
4" / 100mm
Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - Unknown maker "blue border"

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

This patch was executed on a blue twill which gives the illusion of a blue border. Modern embroidery used.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - 3" - Swissartex

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and it attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

Size: 
3" / 76mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - Swissartex

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

This version of the STS-29 was manufactured by Swissartex Emblem Inc. if it has a vacuum sealed backing. Or if it is the modern one with a plastic coated backing then it is Eagle Crest Emblem Inc. of Taiwan. Modern embroidery techniques eliminate one of the most beautiful aspects of the original A-B Emblem version, the radiating background. 

 
Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - A-B Emblem

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-41D - Swissartex

STS-41-D was the 12th flight of NASA's Space Shuttle program, and the first mission of the orbiter Discovery. It was launched from Kennedy Space Center, Florida, on 30 August 1984, and landed on 5 September. Three commercial communications satellites were deployed into orbit during the six-day mission, and a number of scientific experiments were conducted.
The mission was delayed by more than two months from its original planned launch date, having experienced the Space Shuttle program's first launch abort at T-6 seconds on 26 June 1984.

This patch is lighter blue than the other versions of this patch.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-41D - Cape Kennedy Medals

STS-41-D was the 12th flight of NASA's Space Shuttle program, and the first mission of the orbiter Discovery. It was launched from Kennedy Space Center, Florida, on 30 August 1984, and landed on 5 September. Three commercial communications satellites were deployed into orbit during the six-day mission, and a number of scientific experiments were conducted.
The mission was delayed by more than two months from its original planned launch date, having experienced the Space Shuttle program's first launch abort at T-6 seconds on 26 June 1984.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-41D - A-B Emblem

STS-41-D was the 12th flight of NASA's Space Shuttle program, and the first mission of the orbiter Discovery. It was launched from Kennedy Space Center, Florida, on 30 August 1984, and landed on 5 September. Three commercial communications satellites were deployed into orbit during the six-day mission, and a number of scientific experiments were conducted.
The mission was delayed by more than two months from its original planned launch date, having experienced the Space Shuttle program's first launch abort at T-6 seconds on 26 June 1984.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - coats