wilson

added via import

STS-121 - 4" - Cape Kennedy Medals

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - A-B Emblem

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

The A-B Emblem version has a star that is fully embroidered and it has a cut edge. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-131 - 4" - Bama Space Patches

STS-131 (ISS assembly flight 19A) was a NASA Space Shuttle mission to the International Space Station (ISS). Space Shuttle Discovery launched on 5 April 2010 at 6:21 am from Kennedy Space Center's launch pad 39A, and landed at 9:08 am on 20 April 2010 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for space shuttle Discovery.
The primary payload was a Multi-Purpose Logistics Module loaded with supplies and equipment for the International Space Station. The mission also removed and replaced an ammonia tank assembly outside the station on the S1 truss. STS-131 furthermore carried several on-board payloads; this mission had the most payloads since STS-107.

The STS-131/19A crew patch highlights the Space Shuttle in the Rendezvous Pitch Maneuver (RPM). This maneuver is heavily photographed by the International Space Station (ISS) astronauts, and the photos are analyzed back on earth to clear the Space Shuttle's thermal protection system for re-entry. The RPM illustrates the teamwork and safety process behind each Space Shuttle launch. In the Space Shuttle's cargo bay is the Multi-Purpose Logistics Module (MPLM), Leonardo, which is carrying several science racks, the last of the four crew quarters, and supplies for the ISS. Out of view and directly behind the MPLM, is the Ammonia Tank Assembly (ATA) that will be used to replace the current ATA. This will take place during three Extra Vehicular Activities (EVAs). The 51.6° Space Shuttle orbit is illustrated by the three gold bars of the astronaut symbol, and its elliptical wreath contains the orbit of the ISS. The star atop the astronaut symbol is the dawning sun, which is spreading its early light across the Earth. The background star field contains seven stars, one for each crewmember; they are proud to represent the United States and Japan during this mission.

This STS-131 patch is the second patch from Bama Space Patches.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-131 - 4" - A-B Emblem

STS-131 (ISS assembly flight 19A) was a NASA Space Shuttle mission to the International Space Station (ISS). Space Shuttle Discovery launched on 5 April 2010 at 6:21 am from Kennedy Space Center's launch pad 39A, and landed at 9:08 am on 20 April 2010 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for space shuttle Discovery.
The primary payload was a Multi-Purpose Logistics Module loaded with supplies and equipment for the International Space Station. The mission also removed and replaced an ammonia tank assembly outside the station on the S1 truss. STS-131 furthermore carried several on-board payloads; this mission had the most payloads since STS-107.

The STS-131/19A crew patch highlights the Space Shuttle in the Rendezvous Pitch Maneuver (RPM). This maneuver is heavily photographed by the International Space Station (ISS) astronauts, and the photos are analyzed back on earth to clear the Space Shuttle's thermal protection system for re-entry. The RPM illustrates the teamwork and safety process behind each Space Shuttle launch. In the Space Shuttle's cargo bay is the Multi-Purpose Logistics Module (MPLM), Leonardo, which is carrying several science racks, the last of the four crew quarters, and supplies for the ISS. Out of view and directly behind the MPLM, is the Ammonia Tank Assembly (ATA) that will be used to replace the current ATA. This will take place during three Extra Vehicular Activities (EVAs). The 51.6° Space Shuttle orbit is illustrated by the three gold bars of the astronaut symbol, and its elliptical wreath contains the orbit of the ISS. The star atop the astronaut symbol is the dawning sun, which is spreading its early light across the Earth. The background star field contains seven stars, one for each crewmember; they are proud to represent the United States and Japan during this mission.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-120 - 4" - Unknown maker

STS-120 was a space shuttle mission to the International Space Station (ISS) that launched on 23 October 2007 from the Kennedy Space Center, Florida. The mission is also referred to as ISS-10A by the ISS program. STS-120 delivered the Harmony module and reconfigured a portion of the station in preparation for future assembly missions. STS-120 was flown by Space Shuttle Discovery, and was the twenty-third space shuttle mission to the ISS.

The STS-120 patch reflects the role of the mission in the future of the space program. The shuttle payload bay carries Node 2, the doorway to the future international laboratory elements on the International Space Station. On the left the star represents the International Space Station; the red colored points represent the current location of the P6 solar array, furled and awaiting relocation when the crew arrives. During the mission, the crew will move P6 to its final home at the end of the port truss. The gold points represent the P6 solar array in its new location, unfurled and producing power for science and life support. On the right, the moon and Mars can be seen representing the future of NASA. The constellation Orion rises in the background, symbolizing NASA's new exploration vehicle. Through all, the shuttle rises up and away, leading the way to the future. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-120 - 4" - A-B Emblem

STS-120 was a space shuttle mission to the International Space Station (ISS) that launched on 23 October 2007 from the Kennedy Space Center, Florida. The mission is also referred to as ISS-10A by the ISS program. STS-120 delivered the Harmony module and reconfigured a portion of the station in preparation for future assembly missions. STS-120 was flown by Space Shuttle Discovery, and was the twenty-third space shuttle mission to the ISS.

The STS-120 patch reflects the role of the mission in the future of the space program. The shuttle payload bay carries Node 2, the doorway to the future international laboratory elements on the International Space Station. On the left the star represents the International Space Station; the red colored points represent the current location of the P6 solar array, furled and awaiting relocation when the crew arrives. During the mission, the crew will move P6 to its final home at the end of the port truss. The gold points represent the P6 solar array in its new location, unfurled and producing power for science and life support. On the right, the moon and Mars can be seen representing the future of NASA. The constellation Orion rises in the background, symbolizing NASA's new exploration vehicle. Through all, the shuttle rises up and away, leading the way to the future. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - "Volkov" - Cape Kennedy Medals

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

There were several crew changes made along the way for STS-121. This version has Volkov instead of Reiter. Thomas Reiter's position was previously planned to be filled by Sergey Volkov (Russia) before the launch of STS-121 was postponed until July 2006.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - "Caldwell" - Randy Hunt

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

There were several crew changes made along the way for STS-121. Randy Hunt captured several of these variations:

This version has Caldwell instead of Reiter.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - "No Reiter" - Randy Hunt

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

There were several crew changes made along the way for STS-121. Randy Hunt captured several of these variations:

This version lacks Reiter. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - Unknown maker

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

This version differs from the A-B Emblem version as it does not have a fully embroidered star or cut edge. It is similar to the Cape Kennedy Medals version however the embroidery of the yellow lanes leading to the sun are fully embroidered. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

ASTROLAB original

This ASTROLAB patch is one of the original patches designed by German space artist Detlev van Ravenswaay (bottom image left - his internet site: www.vanravenswaay.com/explorer/index.html) which he kindly gave to me. Unfortunately he was not able to tell me who did manufactured it.

"Between 4 July and 22 December 2006, Thomas Reiter took part in the Astrolab Mission - ESA's first long-duration mission to the International Space Station. Following the launch with Space Shuttle Discovery on flight STS-121, Reiter spent 166 days on board ISS as Flight Engineer 2 for ISS Expedition crews 13 and 14. During his stay, as well as his duties as Flight Engineer, he conducted 19 experiments on behalf of a number of European institutions and research centres, focussing on areas such as human physiology and psychology, microbiology, plasma physics and radiation dosimetry as well as technology demonstrations. On 3 August 2006, together with NASA astronaut Jeff Williams, he participated in a 5 hour 54 minute spacewalk to install hardware on the ISS exterior to support future assembly work. After 171 days in space, Reiter returned to Earth with STS-116 [Discovery], landing at Kennedy Space Center, Florida, on 22 December 2006." (extracted from www.esa.int/Our_Activities/Human_Spaceflight/Astrolab).

Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)
Subscribe to RSS - wilson