iss-ulf1.1

STS-121 - 4" - Cape Kennedy Medals

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - A-B Emblem

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

The A-B Emblem version has a star that is fully embroidered and it has a cut edge. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - ISS Assembly ULF 1.1

Key items being delivered, as part of over 2 tons of cargo include: Multi Purpose Logistics Module (MPLM) Leonardo on its 4th flight, 7th MPLM overall, carrying:
−80 °C Freezer
This freezer is known as the Minus Eighty Degree Laboratory Freezer for ISS (MELFI). The French-built unit comprises four independent drawers which can be set to operate at different temperatures.[2] Initially, temperatures of −80 °C, −26 °C, and +4 °C will be used during on-orbit ISS operations. Both reagents and samples will be stored in the freezer. As well as storage, the freezer is designed to be used to transport samples to and from the ISS in a temperature controlled environment. The total capacity of the unit is 300 liters.[3]

ICC STS-121
The European Modular Cultivation System (EMCS) for biological experiments.
This consists of a gas tight incubator in which there are two centrifuges, each able to carry four experimental cartridges. Two "Ground controls"—exact copies of the equipment and experiments—will be run on the ground, one in Europe and one at NASA's Ames Research Center.
New oxygen generation system
This device is considered a test for an equipment design with potential for use on proposed future long durations to the Moon and Mars. The system will initially run below its maximum capacity, though it is designed for enabling the ISS to support a crew of six in the future. It will supplement the Russian-built Elektron system operating in the Zvezda module.

LMC with TPS Repair Box
New cycling machine for the ISS crew
A Danish built device, the Cycle Ergometer with Vibration Isolation System (CEVIS)[4]
Replacement common cabin air assembly heat exchanger used to control the internal air temperature of the ISS.

Classification: 
Rating: 
0
No votes yet
Collector Value: 
4
Average: 4 (1 vote)

STS-121 - 4" - "Volkov" - Cape Kennedy Medals

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

There were several crew changes made along the way for STS-121. This version has Volkov instead of Reiter. Thomas Reiter's position was previously planned to be filled by Sergey Volkov (Russia) before the launch of STS-121 was postponed until July 2006.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - "Caldwell" - Randy Hunt

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

There were several crew changes made along the way for STS-121. Randy Hunt captured several of these variations:

This version has Caldwell instead of Reiter.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - "No Reiter" - Randy Hunt

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

There were several crew changes made along the way for STS-121. Randy Hunt captured several of these variations:

This version lacks Reiter. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-121 - 4" - Unknown maker

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and European Space Agency (ESA) astronaut Thomas Reiter from Germany to the ISS.

STS-121 was also designated the ISS Assembly Mission ULF 1.1. As the mission followed on from STS-114 in carrying out the recommendations made in response to the Columbia Accident Investigation Board report, it was considered a Return to Flight test mission. Its successful launch and landing led NASA to fully resume regular Space Shuttle launches in the construction of the ISS.

This version differs from the A-B Emblem version as it does not have a fully embroidered star or cut edge. It is similar to the Cape Kennedy Medals version however the embroidery of the yellow lanes leading to the sun are fully embroidered. 

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - iss-ulf1.1