maclean

added via import

Steve MacLean - Personal patch

He was designated in December 1985 as the Canadian Payload Specialist to fly with the CANEX-2 set of Canadian experiments in space. His mission, STS-52, took place October 22 to November 1, 1992.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

STS-115 - 4" - Unknown maker

STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from Pad 39-B at the Kennedy Space Center on 9 September 2006 at 11:14:55 EDT (15:14:55 UTC).
The mission is also referred to as ISS-12A by the ISS program. The mission delivered the second port-side truss segment (ITS P3/P4), a pair of solar arrays (2A and 4A), and batteries. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment, and did other maintenance work on the station.

This STS-115 patch has a different border and lacks horizontal elements on the solar arrays.

Size: 
4" / 100mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-115 - 4" - A-B Emblem (Modern)

STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from Pad 39-B at the Kennedy Space Center on 9 September 2006 at 11:14:55 EDT (15:14:55 UTC).
The mission is also referred to as ISS-12A by the ISS program. The mission delivered the second port-side truss segment (ITS P3/P4), a pair of solar arrays (2A and 4A), and batteries. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment, and did other maintenance work on the station.

Size: 
4.25" / 108mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-115 - 4" - A-B Emblem

STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from Pad 39-B at the Kennedy Space Center on 9 September 2006 at 11:14:55 EDT (15:14:55 UTC).
The mission is also referred to as ISS-12A by the ISS program. The mission delivered the second port-side truss segment (ITS P3/P4), a pair of solar arrays (2A and 4A), and batteries. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment, and did other maintenance work on the station.

Size: 
4.25" / 108mm
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-52 - 4" - Eagle Crest Emblem Inc.

STS-52 was a Space Transportation System (NASA Space Shuttle) mission using orbiter Columbia, and launched 22 October 1992.

Primary mission objectives were deployment of the Laser Geodynamic Satellite II (LAGEOS-II) and operation of the U.S. Microgravity Payload-1 (USMP-1). LAGEOS-II, a joint effort between NASA and the Italian Space Agency (ASI), was deployed on day 2 and boosted into an initial elliptical orbit by ASI's Italian Research Interim Stage (IRIS). The spacecraft's apogee kick motor later circularized LAGEOS orbit at its operational altitude of 3,666 miles. The USMP-1, activated on day one, included three experiments mounted on two connected Mission Peculiar Equipment Support Structures (MPESS) mounted in the orbiter's cargo bay. USMP-1 experiments were: Lambda Point Experiment; Matériel Pour L'Etude Des Phénomènes Intéressant La Solidification Sur Et En Orbite (MEPHISTO), sponsored by the French agency Centre National d'Études Spatiales; and Space Acceleration Measurement System (SAMS).

This Eagle Crest version of the STS-52 patch has a blue border that goes all the way around the patch including the red point.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-52 - 4" - Unknown maker.

STS-52 was a Space Transportation System (NASA Space Shuttle) mission using orbiter Columbia, and launched 22 October 1992.

Primary mission objectives were deployment of the Laser Geodynamic Satellite II (LAGEOS-II) and operation of the U.S. Microgravity Payload-1 (USMP-1). LAGEOS-II, a joint effort between NASA and the Italian Space Agency (ASI), was deployed on day 2 and boosted into an initial elliptical orbit by ASI's Italian Research Interim Stage (IRIS). The spacecraft's apogee kick motor later circularized LAGEOS orbit at its operational altitude of 3,666 miles. The USMP-1, activated on day one, included three experiments mounted on two connected Mission Peculiar Equipment Support Structures (MPESS) mounted in the orbiter's cargo bay. USMP-1 experiments were: Lambda Point Experiment; Matériel Pour L'Etude Des Phénomènes Intéressant La Solidification Sur Et En Orbite (MEPHISTO), sponsored by the French agency Centre National d'Études Spatiales; and Space Acceleration Measurement System (SAMS).

Modern make, possibly Far Eastern manufacturer, (Taiwan). NOT Eagle Crest Emblem Inc. This patch has a clear shiny plastic coated backing.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-52 - 4" - A-B Emblem

STS-52 was a Space Transportation System (NASA Space Shuttle) mission using orbiter Columbia, and launched 22 October 1992.

Primary mission objectives were deployment of the Laser Geodynamic Satellite II (LAGEOS-II) and operation of the U.S. Microgravity Payload-1 (USMP-1). LAGEOS-II, a joint effort between NASA and the Italian Space Agency (ASI), was deployed on day 2 and boosted into an initial elliptical orbit by ASI's Italian Research Interim Stage (IRIS). The spacecraft's apogee kick motor later circularized LAGEOS orbit at its operational altitude of 3,666 miles. The USMP-1, activated on day one, included three experiments mounted on two connected Mission Peculiar Equipment Support Structures (MPESS) mounted in the orbiter's cargo bay. USMP-1 experiments were: Lambda Point Experiment; Matériel Pour L'Etude Des Phénomènes Intéressant La Solidification Sur Et En Orbite (MEPHISTO), sponsored by the French agency Centre National d'Études Spatiales; and Space Acceleration Measurement System (SAMS).

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Canadian Astronaut Program

There appear to be several versions of this patch, including a gray-bordered version and a version without the star cluster on the left.

Classification: 
Rating: 
0
No votes yet
Collector Value: 
2
Average: 2 (1 vote)

Steve MacLean

He was designated in December 1985 as the Canadian
Payload Specialist to fly with the CANEX-2 set of Canadian experiments in
space. His mission, STS-52, took place October 22 to November 1, 1992.

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - maclean