springer

STS-38 - 4" - Unknown maker

STS-38 was a space shuttle mission by NASA using the Space Shuttle Atlantis. It was the 37th shuttle mission, and carried a classified payload for the U.S. Department of Defense. It was the 7th flight for Atlantis and the 7th flight dedicated to the Department of Defense. The mission was a 4-day mission that traveled more than 2 million miles and completed 79 revolutions. Atlantis landed at Kennedy Space Center's Shuttle Landing Facility's runway 33. The launch was originally scheduled for July 1990, but was rescheduled due to a hydrogen leak found on Space Shuttle Columbia during the STS-35 countdown. During a rollback to the Orbiter Processing Facility Atlantis was damaged during a hail storm. The eventual launch date of 15 November 1990 was set due to a payload problem. The launch window was between 18:30 and 22:30 EST. The launch occurred at 18:48 EST.

This version of the patch has a more orange appearance.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-38 - Swissartex

STS-38 was a space shuttle mission by NASA using the Space Shuttle Atlantis. It was the 37th shuttle mission, and carried a classified payload for the U.S. Department of Defense. It was the 7th flight for Atlantis and the 7th flight dedicated to the Department of Defense. The mission was a 4-day mission that traveled more than 2 million miles and completed 79 revolutions. Atlantis landed at Kennedy Space Center's Shuttle Landing Facility's runway 33. The launch was originally scheduled for July 1990, but was rescheduled due to a hydrogen leak found on Space Shuttle Columbia during the STS-35 countdown. During a rollback to the Orbiter Processing Facility Atlantis was damaged during a hail storm. The eventual launch date of 15 November 1990 was set due to a payload problem. The launch window was between 18:30 and 22:30 EST. The launch occurred at 18:48 EST.

The leading edges of the shuttle's wings has a wavy or bumpy appearance in the Swissartex version of this patch.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-38 - A-B Emblem

STS-38 was a space shuttle mission by NASA using the Space Shuttle Atlantis. It was the 37th shuttle mission, and carried a classified payload for the U.S. Department of Defense. It was the 7th flight for Atlantis and the 7th flight dedicated to the Department of Defense. The mission was a 4-day mission that traveled more than 2 million miles and completed 79 revolutions. Atlantis landed at Kennedy Space Center's Shuttle Landing Facility's runway 33. The launch was originally scheduled for July 1990, but was rescheduled due to a hydrogen leak found on Space Shuttle Columbia during the STS-35 countdown. During a rollback to the Orbiter Processing Facility Atlantis was damaged during a hail storm. The eventual launch date of 15 November 1990 was set due to a payload problem. The launch window was between 18:30 and 22:30 EST. The launch occurred at 18:48 EST.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
3
Average: 3 (1 vote)
Collector Value: 
0
No votes yet

STS-29 - Unknown maker "blue border"

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

This patch was executed on a blue twill which gives the illusion of a blue border. Modern embroidery used.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - 3" - Swissartex

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and it attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

Size: 
3" / 76mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - Swissartex

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

This version of the STS-29 was manufactured by Swissartex Emblem Inc. if it has a vacuum sealed backing. Or if it is the modern one with a plastic coated backing then it is Eagle Crest Emblem Inc. of Taiwan. Modern embroidery techniques eliminate one of the most beautiful aspects of the original A-B Emblem version, the radiating background. 

 
Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - A-B Emblem

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - springer