wang

STS-51B - Drop Dynamics Module - DDM

Positioning techniques using the effects of acoustic-radiation pressure were used during the Spacelab 3 flight to carry out classical fluid dynamics experiments on liquid drops freely suspended in microgravity. Quantitative results dealing with the equilibrium shapes of acoustically rotated drops, with the response to the radiation pressure forces, and finally with the experimental measurement of surface tension have been obtained.

In June of 1983, Dr. Wang was selected by NASA to train as an astronaut-scientist for Spacelab-3, a research facility flown in the cargo bay of the space shuttle. In 1985, Dr. Wang flew aboard the Challenger as part of a seven member crew on the successful STS-51B mission (April 29 - May 5). During the flight, Dr. Wang studied the dynamic behavior of rotating spheroids in zero gravity in an experimental facility which he designed called the Drop Dynamics Module (DDM).

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
2
Average: 2 (1 vote)

STS-51B - Unknown maker

STS 51-B was the seventeenth flight of NASA's Space Shuttle program, and the seventh flight of Space Shuttle Challenger. The launch of Challenger on 29 April 1985 was delayed by 2 minutes and 18 seconds, due to a launch processing failure. Challenger was initially rolled out to the pad to launch on the STS-51-E mission. The shuttle was rolled back when a timing issue emerged with the TDRS-B satellite. When STS-51-E was canceled, Challenger was remanifested with the STS-51-B payloads. The shuttle landed successfully on 6 May 1985, after a week-long mission.

This patch is virtually identical to the A-B Emblem version, so it could possibly be a modern version from them using newer embroidery style.

Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-51B - Unknown maker

STS 51-B was the seventeenth flight of NASA's Space Shuttle program, and the seventh flight of Space Shuttle Challenger. The launch of Challenger on 29 April 1985 was delayed by 2 minutes and 18 seconds, due to a launch processing failure. Challenger was initially rolled out to the pad to launch on the STS-51-E mission. The shuttle was rolled back when a timing issue emerged with the TDRS-B satellite. When STS-51-E was canceled, Challenger was remanifested with the STS-51-B payloads. The shuttle landed successfully on 6 May 1985, after a week-long mission.

This version of the patch has squared-off corners on the tab, single piece construction and modern embroidery. It also lacks a yellow border on the outer edge.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-51B - Swissartex

STS 51-B was the seventeenth flight of NASA's Space Shuttle program, and the seventh flight of Space Shuttle Challenger. The launch of Challenger on 29 April 1985 was delayed by 2 minutes and 18 seconds, due to a launch processing failure. Challenger was initially rolled out to the pad to launch on the STS-51-E mission. The shuttle was rolled back when a timing issue emerged with the TDRS-B satellite. When STS-51-E was canceled, Challenger was remanifested with the STS-51-B payloads. The shuttle landed successfully on 6 May 1985, after a week-long mission.

The Swissartex version of this patch has a radial border area stitching and  is a single piece construction.

There are two versions of this STS-51B patch manufactured by Swissartex Emblem Inc. One with a waxy matt plastic coated backing, & the other with a shiny vacuum sealed backing.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-51B - A-B Emblem

STS 51-B was the seventeenth flight of NASA's Space Shuttle program, and the seventh flight of Space Shuttle Challenger. The launch of Challenger on 29 April 1985 was delayed by 2 minutes and 18 seconds, due to a launch processing failure. Challenger was initially rolled out to the pad to launch on the STS-51-E mission. The shuttle was rolled back when a timing issue emerged with the TDRS-B satellite. When STS-51-E was canceled, Challenger was remanifested with the STS-51-B payloads. The shuttle landed successfully on 6 May 1985, after a week-long mission.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet
Subscribe to RSS - wang