tdrs-4

added via import

TDRS-4 - TRW- STS-29

TDRS-4, known before launch as TDRS-D, is an American communications satellite which was operated by NASA as part of the Tracking and Data Relay Satellite System from 1989 until 2011. It was constructed by TRW, based on a custom satellite bus which was used for all seven of the first generation TDRS satellites

Project: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - Unknown maker "blue border"

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

This patch was executed on a blue twill which gives the illusion of a blue border. Modern embroidery used.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - 3" - Swissartex

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and it attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

Size: 
3" / 76mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - Swissartex

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

This version of the STS-29 was manufactured by Swissartex Emblem Inc. if it has a vacuum sealed backing. Or if it is the modern one with a plastic coated backing then it is Eagle Crest Emblem Inc. of Taiwan. Modern embroidery techniques eliminate one of the most beautiful aspects of the original A-B Emblem version, the radiating background. 

 
Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

STS-29 - A-B Emblem

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth's orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

The mission's primary payload was a Tracking and Data Relay Satellite (TDRS-D), which became TDRS-4 after deployment, and its attached Inertial Upper Stage (IUS). The satellite was deployed from the shuttle's payload bay less than six hours after launch, at 3:12 am EST. The first-stage orbit burn of the IUS took place an hour later, and the second burn to circularize the orbit occurred 12 hours and 30 minutes into the mission. The satellite was stationed at 41 degrees west longitude.

Size: 
4" / 100mm
Project: 
Classification: 
Rating: 
0
No votes yet
Collector Value: 
0
No votes yet

Tracking and Data Relay Satellite (TDRS-4) TRW

Project: 
Classification: 
Tags: 
Rating: 
0
No votes yet
Collector Value: 
3
Average: 3 (1 vote)

There are people who have this patch for sale!

Notes:
This is just one of HUNDREDS of Space related patches I have to trade. Many shuttle mission patches, LOTS of payload/experiment patches. Plenty of Rocket/Satellite launches as well. I have plenty of lists I can send. Willing to make great deals if you have a patch I need. Don't think I have them all, plenty of them I still seek and you might have that one! Thanks in advance
Subscribe to RSS - tdrs-4