Payload on Spacelab on STS-61A
The first West German mission Deutschland 1 (Spacelab-D1, DLR-1, NASA designation STS-61-A) took place in 1985. A second similar mission, Deutschland 2 (Spacelab-D2, DLR-2, NASA designation STS-55), was first planned for 1988, but due to the Space Shuttle Challenger disaster, was delayed until 1993. It became the first German manned space mission after German reunification.